Guidelines
FiT Guidelines
Guidelines for Eligibility for the Bonus S02
Power Systems Study Guideline
Guideline for ST provisional license
Guideline for ST Permanent License 2015
TNB Interconnection Guidebook (PV)
Procedure For The T&C Of GCPV
Guideline for Biomass & Biogas Acceptance Test
Home owner's guideline for Solar PV
Step-by-Step Guidelines
Guideline for the T&C of Small Hydro
Forms
FiT Application Form
ST's License Form
Standardized REPPAs
Save Rebate Program (Chiller)
Registered PV Service Provider Form
Presentation Materials
SEDA Annual Report
Annual Report
Annual Report 2017
Annual Report 2016
Annual Report 2015
Annual Report 2014
Annual Report 2013
Annual Report 2012
Annual Report 2011
Other Information
Media
Press Releases
News
Jobs@SEDA
Advertisements
Magazine
SEDA Magazine
Sustainable Energy Malaysia Vol. 2 Issue 6
Sustainable Energy Malaysia Vol. 2 Issue 5
Sustainable Energy Malaysia Vol. 2 Issue 4
Sustainable Energy Malaysia Vol. 1 Issue 3
Sustainable Energy Malaysia Vol. 1 Issue 2
Sustainable Energy Malaysia Vol. 1 Issue 1
e-Brochure


Home  »  Download & Media  »  Guidelines  »  Power Systems Study Guideline


Power Systems Study or Connection Confirmation Check
 

Before applying for the FiT application, the interested party is required to contact the Distribution Licensee (DL)
for the below study:

i. Power Systems Study (PSS) for any RE installation more than 425 kW and above; or

ii. Connection Confirmation Check (CCC) for any RE installation more than 12 kW up to 425 kW.

For grid-connection, PSS or CCC are necessary to assess the potential impact of the distributed generation on the planning and operation of the DL’s distribution system. The studies shall be conducted by the DL or its appointed consultant.

For any enquiries on PSS, please contact:

a) TENAGA NASIONAL BERHAD (TNB)

Mr. Sansubari Che Mud at 03 - 7967 9346 / 019 - 959 7745 or email Sansubari@tnb.com.my 

Sustainable Energy Development

Tenaga Nasional Berhad

No. 129, Jalan Bangsar

59200 Kuala Lumpur

 

b) SABAH ELECTRICITY SDN. BHD. (SESB)

 

Mr. Terrence John Kouju at 088 - 282 478 or email terrencek@sesb.com.my

 

Chief Engineer

Sustainable Energy Development,

Asset Development,

6th Floor, Wisma SESB,

Jalan Tunku Abdul Rahman,

88673 Kota Kinabalu,

Sabah, Malaysia.

Connection Confirmation Check:

Net Export Capacity or Rated kWp of RE Installation

Cost (RM)

Completion Period

More than 12kW up to 180kW 1, 000 30 days
More than 180kW up to 425kW 5, 000 30 days

Power Systems Studies (PSS) Cost and Completion Period:

No Net Export Capacity or Rated kWp of RE Installation Cost (RM)

Completion Period

1

Above 425kW & up to & including 1MW or above 425kWp

and up to and including 1000kWp

20,000

per installation

30 Days
2

Above 1MW & up to and including 10MW or 1,000kWp

and up to and including 10, 000kWp

40,000

per installation

40 Days
3

Above 10MW & up to and including 30MW or 10, 000kWp

and up to and including 30,000kWp

60,000

per installation

50 Days
4

Above 425kW and up to and including 1MW or above 425kWp and

up to and including 1,000kWp for housing development or individual

applications on the solar PV to be connected to the same distribution

substation.

500.00

per installation

 

60 Days

 

 