Guidelines of Solar Photovoltaic Installation on NEM Scheme & Schedule 1
Guidelines of Solar Photovoltaic Installation on NEM Scheme & Schedule 1 (Amendment 2019) - 14/1/2019
|


|
Schedule 2:
|
Form A – NEM Manual Application Form |
 |
Form B – NEM Contract for Domestic Consumer
Form B – NEM Contract for Domestic Consumer (Revision 1) - 14/1/2019
|


|
Form B – NEM Contract for Commercial & Industrial Consumer
Form B – NEM Contract for Commercial, Industrial & Agriculture Consumer (Revision 1) - 14/1/2019
|


|
Schedule 3: |
RE (Technical and Operational Requirements) Rules 2011
|
 |
RE (Technical and Operational Requirements) (Amendment) Rules 2014 |
 |
Schedule 4: |
Technical Guideline for Connection of Indirect Solar PV Power Generation for NEM
Technical Guideline for Connection of Indirect Solar PV Power Generation for NEM (Revision 1)
Technical Guideline for Connection of Indirect Solar PV Power Generation for NEM (Revision 2) - 14/1/2019
|



|
PROCEDURE FOR NET ENERGY METERING ASSESSMENT STUDY (NEMAS)
Before applying for the NEM application, the interested party is required to contact the Distribution Licensee (TNB) to conduct NEM Assessment Study (NEMAS) for installation above 72 kW. The requirement for a mandatory study is generally based on the rated kW of the proposed installation as shown table below:
Installed Capacity |
Study Required |
Fee of Study |
1-72 kW |
No |
- |
>72 kW - 180 kW |
Yes |
RM1,000.00 |
>180 kW - 425 kW |
Yes |
RM5,000.00 |
>425 kW - 1 MW |
Yes |
RM8,000.00 |
>1 MW - 2 MW |
Yes |
RM15,000.00 |
>2 MW - 5 MW |
Yes |
RM20,000.00 |
>5 MW - 10 MW |
Yes |
RM30,000.00 |
>10 MW - 30 MW |
Yes |
RM40,000.00 |
The studies shall be conducted by the DL or its appointed consultant to establish the technical and safety requirements and determine the feasibility of the connection.
1. NEMAS Process Flow - NEW as of 2 July 2018 |
 |
2. NEM - Technical Study Application Form - NEW as of 2 July 2018 |
 |
3. NEM Customer Load Profile Form - NEW as of 2 July 2018 |
 |
PROCEDURE FOR NEM METER APPLICATION AND SIGNING NEM CONTRACT
-
Please click the Flowchart of NEM Application Process (updated as of 19 April 2019) for the details on workflow:
-
NEM applicant must submit the application, only after all of the installation work for Solar PV fully completed.
-
Please ensure that meter requirement is fulfilled (3 phase meter board, meter relocation) prior to submitting the application.
-
Only fully-completed application will be processed. Incomplete application will be returned to applicant. TNB reserves the right to reject incomplete submission.
-
Submission must be done at TNB Subzone Office, including the following forms and supporting documents:
Net Energy Metering (NEM) Meter Application with all of the forms and supporting documents as below:-
-
NEM Meter Application Form;
-
NEM Certificate;
-
Pictures of TNB meter and interconnection from the grid;
-
Picture of proposed meter location (If there are changes of meter location for the existing meter).
NEM Contract including the following forms and supporting documents as below:-
-
NEM Declaration Form (TNB Contract);
-
Form G & Form H;
-
A copy of Generating License by Suruhanjaya Tenaga (subject to requirement according to Electricity Supply Act 1990)
-
NEM Contract (Domestic/Non Domestic);
-
TNB Inspection & Commissioning Form
1. NEM Meter Application Form - UPDATED as of 19 April 2019 |
 |
2. NEM Declaration Form (TNB Contract) - UPDATED as of 19 April 2019 |
 |
3. TNB Inspection & Commissioning Form - NEW as of 2 July 2018 |
 |
For any enquiries, please contact:
Mr. Hidayat Fahmi Bin Abdul Rahim
Tel: 03 - 7967 9088 / 019 - 4782540
Email: hfahmi@tnb.com.my / re@tnb.com.my
Address: Tenaga Nasional Berhad
Level 16, Wisma TNB
No 19, Jalan Timur
46200, Petaling Jaya
Selangor Darul Ehsan
|