There are nine (9) types of standardized Renewable Energy Power Purchase Agreements (REPPAs) under the FiT. They are :-
Renewable Resource |
Forms |
Installed Capacity |
Biogas |
Form BG1 |
Installed capacity of up to and including 12 MW |
|
Form BG2 |
Installed capacity of above 12 MW and up to and including 30 MW |
Biomass |
Form BM1 |
Installed capacity of up to and including 12 MW |
|
Form BM2 |
Installed capacity of above 12 MW and up to and including 30 MW |
Small Hydropower |
Form HP1 |
Installed capacity of up to and including 12 MW |
|
Form HP2 |
Installed capacity of above 12 MW and up to and including 30 MW |
Solar PV |
Form PV1 |
Installed capacity of up to and including 1 MW |
|
Form PV2 |
Installed capacity of above 1MW and up to and including 12 MW |
|
Form PV3 |
Installed capacity of above 12 MW and up to and including 30MW |
|
|
|